Staging in place around the C-130 Hercules
Final checks on the re-assembled staging by Borley Brothers' engineers prior to handover to the Canadian Airforce

Two complete sets of single-level maintenance staging were designed, manufactured and erected for the Department of National Defence of Canada at 8 Wing, Trenton, Ontario. The equipment was manufactured at Borley Brothers and containerised for shipping to Canada. On arrival, a team of engineers was sent from Borley Brothers and it took four weeks to erect the staging.

This staging has now been in operation for approximately 12 months. Initial feedback indicates that not only has a safer working environment been established, but also a reduction in man-hours on routine maintenance work on the aircraft has been achieved.

-